Romaine 1 – Dam construction, excavation and concrete work for the spillway.



Client : Hydro-Québec Year : 2013 -2015 Localisation : La Romaine, Côte-Nord

Description :

Construction of a rock-filled dam with asphalt core and integrated spillway

  • Romaine River closure
  • Cofferdam construction (65 000 m3)
  • Dam construction (575 000 m3)
  • Construction of asphalt core (6 500 m3)
  • Crushing (165 000 m3)
  • Spillway concrete works (16 000 m3)
  • Injection de roc Rock injection

Others achievements

ROMAINE-4 – TAILRACE AND BYPASS CAP

Excavating the tailrace cap, concreting the permanent bypass cap and building a conduit bedplate Inject...

Read More
138 ROAD – 138 ROAD EXTENSION LOT1 AND 1A

Construct a remote section of 138 Road, about 14 km long Drilling and blasting foundations...

Read More
PORT-DANIEL-GASCON – RELOCATION OF THE RAILROAD LINE

Excavation of the 1st class and reconstruction of an approximately two-kilometre section of the existing...

Read More

Ask informations

By phone

1 800 263-7705

Write us

Email Us

Apply

Online

x