Eastmain 1 – Rupert river diversion canal – South section



Client : Société d’énergie de la Baie James Year : 2008-2009 Localisation : Baie-James

Description :

Construction of 17 dikes and cofferdams for the Rupert river diversion canal to the Eastmain reservoir

  • Clearing of vegetation (440 ha)
  • Overburden excavation (2 100 000 m3)
  • Rock fill (325 000 m3)
  • Gravel fill (580 000 m3)
  • Till fill (825 000 m3)
  • Gravel screening (250 000 m3)
  • Crushing (100 000 m3)
  • Concrete works (1 100 m3)
  • Rock injection

Others achievements

ROMAINE-4 – TAILRACE AND BYPASS CAP

Excavating the tailrace cap, concreting the permanent bypass cap and building a conduit bedplate Inject...

Read More
138 ROAD – 138 ROAD EXTENSION LOT1 AND 1A

Construct a remote section of 138 Road, about 14 km long Drilling and blasting foundations...

Read More
PORT-DANIEL-GASCON – RELOCATION OF THE RAILROAD LINE

Excavation of the 1st class and reconstruction of an approximately two-kilometre section of the existing...

Read More

Ask informations

By phone

1 800 263-7705

Write us

Email Us

Apply

Online

x