fbpx
AMARUQ/MEADOWBANK – INFRASTRUCTURE IMPROVEMENTS

Contribute to various infrastructure development and improvement projects in close collaboration with various stakeholders

Read More
PORT-DANIEL-GASCON – RELOCATION OF THE RAILROAD LINE

Excavation of the 1st class and reconstruction of an approximately two-kilometre section of the existing...

Read More
MELIADINE – INFRASTRUCTURE IMPROVEMENTS

Contribute to various infrastructure development and improvement projects in close collaboration with various stakeholders

Read More
WHALE TAIL DIKE – DIKE CONSTRUCTION AND GRANULAR FILL

Crushing and screening over 100,000 tons of materials

Read More
MARY RIVER/MILNE INLET – STONE CRUSHING

Crushing and screening aggregates for roads, dynamite filler and runways

Read More
BML – REHABILITATION OF THE LA ROMAINE COMPLEX

Crushing a variety of materials for road infrastructure

Read More
BONNARD SPILLWAY – SPILLWAY CONSOLIDATION

Upgrade spillway with Multi-toron anchors

Read More
AMARUQ – WHALE TAIL DIKE

Drilling and injection of the 17-metre-deep watertight wall

Read More
WINDAFLL – EXPANSION OF THE STERILE STORAGE AREA

Drilling and blasting of water treatment plant pad and basin D

Read More
ROMAINE-4 – TAILRACE AND BYPASS CAP

Excavating the tailrace cap, concreting the permanent bypass cap and building a conduit bedplate Inject...

Read More
138 ROAD – 138 ROAD EXTENSION LOT1 AND 1A

Construct a remote section of 138 Road, about 14 km long Drilling and blasting foundations...

Read More
MELIADINE – OPEN-PIT MINING

Operate the open-pit mine Contribute to open-pit mining in terms of drilling and blasting

Read More
NUNAVIK – OPERATED LABOR AND EQUIPMENT RENTAL

Load and transport materials for mine operations

Read More
WINDFALL – MINING DEVELOPMENT

Earthworks and mine maintenance in partnership with the Waswanipi community

Read More
Romaine 2 – Construction of dykes D2-E2-F2

Construction of 3 rock-filled dikes with asphalt core and stabilization of a 120 meters high...

Read More
BEAM TRANSPORT

Transport of 8 beams of 40 meters long for the construction of the replacement bridge...

Read More
Meadowbank Gold Project – East dike construction

Construction of a 2300 M dike with cement-bentonite core near Baker Lake, Nunavut Construction of...

Read More
Price dam Repair

Active and passive anchors drilling, installation, grouting and tensioning. Consolidation bolts and wire mesh installation.

Read More
Supreme Court of Canada

Consolidation bolts installation , rock wall securing (rope access works).

Read More
Corrugated steel pipe (culvert) rehabilitation

Urethane grouting to channelling water before culvert rebuilding.

Read More
Grouting Goldex Mine

Grouting works for Goldex Mine’s soil stabilisation. Compaction grouting and large volume grouting.

Read More
Melocheville tunnel – major repair

North and south circulation tubes drilling and grouting of the Melocheville tunnel. Passive anchors drilling,...

Read More
Muskrat Falls : North Spur stabilization work

Construction of a cut-off wall, slope stabilization and erosion protection of the upsteam sector of...

Read More
Crushing works : Romaine-3 hydroelectric project

Supply of clean stones for concrete works at Romaine-3 hydroelectric power plant Crushing of 0-200...

Read More
Dolbeau-Mistassini Bridge reconstruction

Active anchors Installation and grouting.

Read More
Romaine 1 – Dam construction, excavation and concrete work for the spillway.

Construction of a rock-filled dam with asphalt core and integrated spillway Romaine River closure Cofferdam...

Read More
Crushing works: Romaine-4 hydroelectric project

Supply of clean stones for concrete works

Read More
Romaine 2 – Access road

Construction of the first 58 km of the permanent road for the Romaine 2 Hydro...

Read More
Eastmain 1 – Rupert river diversion canal – South section

Construction of 17 dikes and cofferdams for the Rupert river diversion canal to the Eastmain...

Read More
Meadowbank Project – Building of the operation road

Building of the operation road and raising dykes Construction of a 50 km road between...

Read More
Four lane upgrade road construction

KM 84 to 96 and KM 215 to 219 Clearing of vegetation Grubbing and stripping...

Read More
Meadowbank Project

Various works for Meadowbank’s mine site Construction of dykes (Bay Goose-Vault-Saddle Dam 1-2) Raising of...

Read More
Production drilling Mont-Wright

Large diameter drilling (250mm)

Read More
Olympic Stadium hydro demolition

100,000 square feet of hydro demolition for the Stadium`s  parking lot and the underside of...

Read More
Ville-Marie tunnel walls repair work

Hydro demolition of the tunnel walls without clearing the rebar.

Read More
CHAMPLAIN BRIDGE REPAIR WORK

Hydro demolition of the pillars and beams

Read More
Production and exploration drilling at the Meadowbank mine site, Nunavut.

Production drilling, pres-splitting drilling and reverse circulation drilling for grade control in the open pit.

Read More
TURCOT INTERCHANGE REPAIR WORK

Hydro demolition of the columns and the upper and lower hollow-core lab

Read More
BONAVENTURE HIGHWAY REPAIR WORK

Hydro demolition of the concrete lab and the trimmer joist

Read More
RESERVOIR REPAIR WORK IN ST-JOHN’S, NL

Hydro blasting of 25 ooo square feet of membrane in a digestive reservoir using UHP...

Read More
METROPOLITAINE HIGHWAY

Hydrodemolition of the columns and the under slabs

Read More
x